top of page

                                      PROJECT o1 >> CASE STUDY : PROPOSING PASSIVE DESIGN STRATEGIES

In this project, in a group of six, we were to analyse on the selected site.that is the charcoal factory in regards to thermal comfort. We we were to study the cause of these issues, as well as propose a new a design featuring environmentally sustainable strategies and techniques in order to combat those difficiencies. We also did the calculations for both before and after the proposed changes, and thus show how big of an improvement the our design was.

​

Record and analyse the existing condition in terms of thermal comfort of the interior directly affected by the basic building design.

​Research should contain the following:
a. Building Introduction (images, pictures, diagrams, drawings and description)
b. Site analysis; micro (wind, sun, topography, etc.)
c. Concept and analysis of buildings basic design strategies and proposed passive design strategy.
d. A proposal to achieve thermal comfort in the chosen space/building, elaborate design features with details, the effect on thermal comfort and importance of it.
e. Appropriate visuals and diagrams (tables, charts, etc.) with appropriate referencing and citation where applicable.

​

// FInal Board

bottom of page