top of page

                                      PROJECT o1 >>ONSITE OBSERVATION JOURNAL AND VIDEO

This project is an on-site exercise where students have to sketch and document the physical and intangible qualities of the buildings as well as the immediate context of the site. It can be from an element as broad as the urban planning itself down to the smallest detail of the ornaments used in the building.

 

Semester 3.5 consists of only one module, Measured Drawing, and in this module there are three assignments. These assignments are all related to a building in which we were assigned to in groups of varying sizes. The building is a traditional Kedah House and Surau. Once home to a local, but was donated as a model house and reassembled in the current location. 

​

On our 5 day trip to the site, we were to document and measure nearly every aspect of the building, and then to produce several projects related from those measurements, chief of which is a model and a set of measured architectural drawings.

 

But for the first assignment, we were to document our own findings in sketches, and these could be done informally, as a form of individual expression, exploration and interpretation of the building. My work mainly focuses on the intricate details of the ornamentsinside and outside of th Kedah traditional house. My work is done on 10 pieces of A4 block, using pencil only.

//FINAL JOURNAL

​

Kedah House Journal-page-001
Kedah House Journal-page-002
Kedah House Journal-page-004
Kedah House Journal-page-003
Kedah House Journal-page-006
Kedah House Journal-page-005
Kedah House Journal-page-007
Kedah House Journal-page-008
Kedah House Journal-page-009
Kedah House Journal-page-010

​

// FINAL VIDEO

                                      PROJECT o2 >>BUILDING REPORT AND PHOTOBOOK

​

// FINAL REPORT

KEDAH REPORT (checked)-page-004
KEDAH REPORT (checked)-page-003
KEDAH REPORT (checked)-page-002
KEDAH REPORT (checked)-page-001
KEDAH REPORT (checked)-page-008
KEDAH REPORT (checked)-page-005
KEDAH REPORT (checked)-page-007
KEDAH REPORT (checked)-page-006
KEDAH REPORT (checked)-page-011
KEDAH REPORT (checked)-page-009
KEDAH REPORT (checked)-page-012
KEDAH REPORT (checked)-page-010
KEDAH REPORT (checked)-page-015
KEDAH REPORT (checked)-page-014
KEDAH REPORT (checked)-page-013
KEDAH REPORT (checked)-page-016
KEDAH REPORT (checked)-page-019
KEDAH REPORT (checked)-page-017
KEDAH REPORT (checked)-page-020
KEDAH REPORT (checked)-page-018
KEDAH REPORT (checked)-page-021
KEDAH REPORT (checked)-page-024
KEDAH REPORT (checked)-page-022
KEDAH REPORT (checked)-page-023
KEDAH REPORT (checked)-page-025
KEDAH REPORT (checked)-page-028
KEDAH REPORT (checked)-page-026
KEDAH REPORT (checked)-page-027
KEDAH REPORT (checked)-page-032
KEDAH REPORT (checked)-page-029
KEDAH REPORT (checked)-page-031
KEDAH REPORT (checked)-page-030
KEDAH REPORT (checked)-page-036
KEDAH REPORT (checked)-page-033
KEDAH REPORT (checked)-page-035
KEDAH REPORT (checked)-page-034
KEDAH REPORT (checked)-page-039
KEDAH REPORT (checked)-page-038
KEDAH REPORT (checked)-page-040
KEDAH REPORT (checked)-page-037
KEDAH REPORT (checked)-page-042
KEDAH REPORT (checked)-page-043
KEDAH REPORT (checked)-page-044
KEDAH REPORT (checked)-page-041
KEDAH REPORT (checked)-page-045
KEDAH REPORT (checked)-page-046
KEDAH REPORT (checked)-page-048
KEDAH REPORT (checked)-page-047
KEDAH REPORT (checked)-page-052
KEDAH REPORT (checked)-page-050
KEDAH REPORT (checked)-page-051
KEDAH REPORT (checked)-page-049
KEDAH REPORT (checked)-page-055
KEDAH REPORT (checked)-page-054
KEDAH REPORT (checked)-page-056
KEDAH REPORT (checked)-page-053
KEDAH REPORT (checked)-page-058
KEDAH REPORT (checked)-page-060
KEDAH REPORT (checked)-page-059
KEDAH REPORT (checked)-page-057
KEDAH REPORT (checked)-page-064
KEDAH REPORT (checked)-page-063
KEDAH REPORT (checked)-page-062
KEDAH REPORT (checked)-page-061
KEDAH REPORT (checked)-page-068
KEDAH REPORT (checked)-page-067
KEDAH REPORT (checked)-page-065
KEDAH REPORT (checked)-page-066
KEDAH REPORT (checked)-page-070
KEDAH REPORT (checked)-page-071
KEDAH REPORT (checked)-page-069
KEDAH REPORT (checked)-page-072
KEDAH REPORT (checked)-page-073
KEDAH REPORT (checked)-page-074
KEDAH REPORT (checked)-page-075
KEDAH REPORT (checked)-page-076
KEDAH REPORT (checked)-page-079
KEDAH REPORT (checked)-page-078
KEDAH REPORT (checked)-page-077
KEDAH REPORT (checked)-page-080
KEDAH REPORT (checked)-page-081
KEDAH REPORT (checked)-page-084
KEDAH REPORT (checked)-page-083
KEDAH REPORT (checked)-page-082
KEDAH REPORT (checked)-page-086
KEDAH REPORT (checked)-page-085
KEDAH REPORT (checked)-page-087
KEDAH REPORT (checked)-page-088
KEDAH REPORT (checked)-page-092
KEDAH REPORT (checked)-page-090
KEDAH REPORT (checked)-page-091
KEDAH REPORT (checked)-page-089
KEDAH REPORT (checked)-page-094
KEDAH REPORT (checked)-page-093
KEDAH REPORT (checked)-page-096
KEDAH REPORT (checked)-page-095
KEDAH REPORT (checked)-page-097
KEDAH REPORT (checked)-page-099
KEDAH REPORT (checked)-page-100
KEDAH REPORT (checked)-page-098
KEDAH REPORT (checked)-page-102
KEDAH REPORT (checked)-page-104
KEDAH REPORT (checked)-page-101
KEDAH REPORT (checked)-page-103
KEDAH REPORT (checked)-page-107
KEDAH REPORT (checked)-page-106
KEDAH REPORT (checked)-page-108
KEDAH REPORT (checked)-page-105
KEDAH REPORT (checked)-page-111
KEDAH REPORT (checked)-page-112
KEDAH REPORT (checked)-page-109
KEDAH REPORT (checked)-page-110
KEDAH REPORT (checked)-page-115
KEDAH REPORT (checked)-page-116
KEDAH REPORT (checked)-page-114
KEDAH REPORT (checked)-page-113
KEDAH REPORT (checked)-page-120
KEDAH REPORT (checked)-page-119
KEDAH REPORT (checked)-page-117
KEDAH REPORT (checked)-page-118
KEDAH REPORT (checked)-page-121
KEDAH REPORT (checked)-page-122
KEDAH REPORT (checked)-page-123
KEDAH REPORT (checked)-page-124
KEDAH REPORT (checked)-page-125
KEDAH REPORT (checked)-page-127
KEDAH REPORT (checked)-page-126
KEDAH REPORT (checked)-page-128
KEDAH REPORT (checked)-page-130
KEDAH REPORT (checked)-page-132
KEDAH REPORT (checked)-page-131
KEDAH REPORT (checked)-page-129
KEDAH REPORT (checked)-page-134
KEDAH REPORT (checked)-page-135
KEDAH REPORT (checked)-page-133
KEDAH REPORT (checked)-page-136
KEDAH REPORT (checked)-page-140
KEDAH REPORT (checked)-page-139
KEDAH REPORT (checked)-page-137
KEDAH REPORT (checked)-page-138
KEDAH REPORT (checked)-page-144
KEDAH REPORT (checked)-page-141
KEDAH REPORT (checked)-page-143
KEDAH REPORT (checked)-page-142
KEDAH REPORT (checked)-page-147
KEDAH REPORT (checked)-page-145
KEDAH REPORT (checked)-page-146
KEDAH REPORT (checked)-page-148
KEDAH REPORT (checked)-page-151
KEDAH REPORT (checked)-page-149
KEDAH REPORT (checked)-page-150
KEDAH REPORT (checked)-page-152
KEDAH REPORT (checked)-page-153
KEDAH REPORT (checked)-page-156
KEDAH REPORT (checked)-page-155
KEDAH REPORT (checked)-page-154
KEDAH REPORT (checked)-page-159
KEDAH REPORT (checked)-page-157
KEDAH REPORT (checked)-page-158
KEDAH REPORT (checked)-page-160
KEDAH REPORT (checked)-page-163
KEDAH REPORT (checked)-page-162
KEDAH REPORT (checked)-page-164
KEDAH REPORT (checked)-page-161
KEDAH REPORT (checked)-page-165
KEDAH REPORT (checked)-page-166
KEDAH REPORT (checked)-page-168
KEDAH REPORT (checked)-page-167
KEDAH REPORT (checked)-page-171
KEDAH REPORT (checked)-page-172
KEDAH REPORT (checked)-page-169
KEDAH REPORT (checked)-page-170
KEDAH REPORT (checked)-page-175
KEDAH REPORT (checked)-page-176
KEDAH REPORT (checked)-page-174
KEDAH REPORT (checked)-page-173
KEDAH REPORT (checked)-page-177
KEDAH REPORT (checked)-page-179
KEDAH REPORT (checked)-page-178
KEDAH REPORT (checked)-page-180
KEDAH REPORT (checked)-page-181
KEDAH REPORT (checked)-page-183
KEDAH REPORT (checked)-page-184
KEDAH REPORT (checked)-page-182
KEDAH REPORT (checked)-page-188
KEDAH REPORT (checked)-page-185
KEDAH REPORT (checked)-page-186
KEDAH REPORT (checked)-page-187
KEDAH REPORT (checked)-page-191
KEDAH REPORT (checked)-page-189
KEDAH REPORT (checked)-page-190
KEDAH REPORT (checked)-page-192
KEDAH REPORT (checked)-page-196
KEDAH REPORT (checked)-page-195
KEDAH REPORT (checked)-page-194
KEDAH REPORT (checked)-page-193
KEDAH REPORT (checked)-page-199
KEDAH REPORT (checked)-page-198
KEDAH REPORT (checked)-page-200
KEDAH REPORT (checked)-page-197
KEDAH REPORT (checked)-page-204
KEDAH REPORT (checked)-page-202
KEDAH REPORT (checked)-page-201
KEDAH REPORT (checked)-page-203
KEDAH REPORT (checked)-page-207
KEDAH REPORT (checked)-page-205
KEDAH REPORT (checked)-page-208
KEDAH REPORT (checked)-page-206
KEDAH REPORT (checked)-page-210
KEDAH REPORT (checked)-page-212
KEDAH REPORT (checked)-page-209
KEDAH REPORT (checked)-page-211
KEDAH REPORT (checked)-page-216
KEDAH REPORT (checked)-page-213
KEDAH REPORT (checked)-page-214
KEDAH REPORT (checked)-page-215
KEDAH REPORT (checked)-page-217
KEDAH REPORT (checked)-page-218
KEDAH REPORT (checked)-page-219
KEDAH REPORT (checked)-page-220
KEDAH REPORT (checked)-page-221
KEDAH REPORT (checked)-page-222
KEDAH REPORT (checked)-page-223
KEDAH REPORT (checked)-page-224
KEDAH REPORT (checked)-page-226
KEDAH REPORT (checked)-page-225
KEDAH REPORT (checked)-page-228
KEDAH REPORT (checked)-page-227
KEDAH REPORT (checked)-page-230
KEDAH REPORT (checked)-page-232
KEDAH REPORT (checked)-page-231
KEDAH REPORT (checked)-page-229
KEDAH REPORT (checked)-page-236
KEDAH REPORT (checked)-page-234
KEDAH REPORT (checked)-page-233
KEDAH REPORT (checked)-page-235
KEDAH REPORT (checked)-page-238
KEDAH REPORT (checked)-page-239
KEDAH REPORT (checked)-page-237
KEDAH REPORT (checked)-page-240

​

// FINAL PHOTOBOOK

                                      PROJECT o3 >>MEASURED DRAWINGS AND MODEL

The project will be carried out throughout the semester where students will be assigned to measure and document a historical / architecturally significant or heritage building and translate all the data into a set of drawings. Each group will have to only measure one particular building assigned by the course coordinator. Apart from doing the measuring exercise on site, students will also need to do additional research in order to piece together all the important data about the building. The model will provide additional physical information of the building.

 

The crux of the semester and thus this module, the measured drawings and model demonstrates our understanding of the building, from its spatial arrangement to its construction. The measured drawings were drawn based on the measurements taken on site, and done on AutoCAD. These drawings had to have proper lineweights, annotations and drawing symbols based on conventions. 

 

Due to the reason our group are given 2 building, one the kedah traditional house and another is the kedah traditional surau, we had to prepared 2 sets of drawing consisting of these 2 buildings. In total, we had done 49 drawings in total, 28 for the house and 21 for the surau. 4 in A0 size and the rest in A0 size. The drawings were of varying scales depending on their suitability. The drawings were compiled and then printed on paper. Included in the drawings are a location plan, the floor plans, ceiling plans, elevations, a few sections, and a lot of detail drawings. 

 

The model was done using the drawings as a guide, and made from balsa wood and MDF boards. The model required extensive laser cutting sessions, in order to preserve the details present in the incredibly ornate interior, and also to showcase the large contrast between the interior and exterior. The joining method of the traditional kedah house can be shown i the model, including the floor joist connection and the roof construction method.

//FINAL DRAWINGS (HOUSE)

​

00 COVER PAGE-page-001
01 SITE PLAN-page-001
02 SITE SECTION-page-001
03 FOUNDATION PLAN-page-001
04 JOIST PLAN-page-001
05 FLOOR PLAN-page-001
06 REFLECTED CEILING PLAN-page-001
07 ROOF PLAN-page-001
08 ELEVATION 01-page-001
09 ELEVATION 02-page-001
10 SECTION 01-page-001
11 SECTION 02-page-001
12 ISONOMETRIC-page-001
13 DOOR SCHEDULE 01-page-001
14 DOOR SCHEDULE 02-page-001
15 DOOR SCHEDULE 03-page-001
16 DOOR SCHEDULE 04-page-001
17 WINDOW SCHEDULE 01-page-001
18 WINDOW SCHEDULE 02-page-001
19 WINDOW SCHEDULE 03-page-001
20 WINDOW SCHEDULE 04-page-001
21 WINDOW SCHEDULE 05-page-001
22 WINDOW SCHEDULE 06-page-001
23 WINDOW SCHEDULE 07-page-001
24 WINDOW SCHEDULE 08-page-001
25 STAIRS SCHEDULE 01-page-001
26 STAIRS SCHEDULE 02-page-001
27 ORNAMENTATIONS-page-001
28 CONSTRUCTION DETAILS-page-001

​

// FINAL DRAWINGS (SURAU)

00 COVER PAGE (SURAU)-page-001
01 SITE PLAN X2-page-001
02 A1 SITE SECTION (1)-page-001
03 FOUNDATION PLAN SURAU-page-001
04 JOIST PLAN SURAU-page-001
05 FLOOR PLAN SURAU-page-001
06 REFLECTED CEILING PLAN SURAU-page-001
07 ROOF PLAN SURAU-page-001
08 NORTH SOUTH ELE SURAU-page-001
09 EAST WEST ELE SURAU-page-001
10 SECTION AB SURAU-page-001
11 SECTION CD SURAU-page-001
12 ISO SURAU NO MEASUREMENT-page-001
13 D1 DETAIL-page-001
14 D2 DETAIL-page-001
15 W1 DETAIL-page-001
16 W2 DETAIL-page-001
17 S1 DETAIL-page-001
18 S2 DETAIL-page-001
19 ABLUTION DETAIL-page-001
20 BEDUK DETAIL-page-001
21 JOINT DETAIL WH MEASUREMENT-page-001

​

// FINAL MODEL

WhatsApp Image 2017-03-07 at 2.07.41 PM

WhatsApp Image 2017-03-07 at 2.07.41 PM

WhatsApp Image 2017-03-06 at 6.22.47 PM

WhatsApp Image 2017-03-06 at 6.22.47 PM

WhatsApp Image 2017-03-06 at 3.41.37 AM

WhatsApp Image 2017-03-06 at 3.41.37 AM

WhatsApp Image 2017-03-06 at 3.41.33 AM

WhatsApp Image 2017-03-06 at 3.41.33 AM

WhatsApp Image 2017-03-06 at 6.22.46 PM

WhatsApp Image 2017-03-06 at 6.22.46 PM

WhatsApp Image 2017-03-06 at 3.41.44 AM

WhatsApp Image 2017-03-06 at 3.41.44 AM

WhatsApp Image 2017-03-07 at 2.07.30 PM

WhatsApp Image 2017-03-07 at 2.07.30 PM

WhatsApp Image 2017-03-07 at 2.07.38 PM

WhatsApp Image 2017-03-07 at 2.07.38 PM

WhatsApp Image 2017-03-07 at 2.07.31 PM

WhatsApp Image 2017-03-07 at 2.07.31 PM

WhatsApp Image 2017-03-07 at 2.07.34 PM

WhatsApp Image 2017-03-07 at 2.07.34 PM

bottom of page